2011년 10월 1일 토요일

Boat Construction (5)

The water tank will be installed underneath  the berth and water pipes are going to go through under the toilet and basin. These are turned under the cockpit and go to galley. To lay pipes I  broke a way. I cut base of basin and made a hole on blukhead between the plinth and  the berth. 




As a next step, I had an oval basin bowl and cut a hole on the top of basin.  Firstly, I put the bowl upside down on the top of timber and drew a line along the shape. By changing the plinth design the position of basin was rotated more.


댓글 없음:

댓글 쓰기